摘要
在结构系统可靠度研究的基础上 ,根据重力坝系统的特点 ,对服役重力坝系统可靠度的计算方法进行了探讨。并通过计算南水北调工程丹江口水库左联混凝土坝第 36坝段的系统可靠度 ,得出了一些有意义的结果。
On the basis of structure system reliability study, the calculation methods for system reliability of gravity dams currently in use are evaluated according to the characteristics of gravity dam system. Through calculating the system reliability of the No. 36 concrete dam reach on the left bank of Danjiangkou Reservoir in the South-to-North Water Transfer Project, some significant results are attained.
出处
《中国农村水利水电》
北大核心
2004年第4期44-47,共4页
China Rural Water and Hydropower
基金
水利部重点科技项目 (合同编号 :SCX2 0 0 2 - 0 9)
关键词
丹江口水库
混凝土重力坝
南水北调工程
系统可靠度
gravity dam
system reliability
failure mode
South-to-North Water Transfer Project
Danjiangkou Reservoir