摘要
本文通过作者在盘海高速公路施工现场任设计代表期间对施工实例的亲身体会 ,提供了在软土地基环境中预应力连续箱梁桥施工工艺过程 ,也为今后预应力连续箱梁桥设计及施工积累了一些实际经验。
Through the experience of the construction example in the design representation period of the expressway of Pan Jin to Hai Cheng expressway,the article provide prestressed reinforcing steel bar concrete continuous box-girder construction technics in the soft soil groundsill and also accumulate practical experience for the design and construction of prestressed reinforcing steel bar concrete continuous box-girder aftertime.
出处
《辽宁交通科技》
2004年第3期36-40,共5页
Liaoning Communication Science and Technology