摘要
从重庆市轨道交通路网规划出发,分析三号线车辆基地组成和功能定位,提出总平面布置方案,既满足单轨车辆使用要求,又充分发挥配套设备能力,体现技术先进、节省投资的设计特点。
The paper suggests a general arrangement of the depot after the study of component,functionality and scale of Line No.3 based upon the Master Plan of Chongqin Rail Transit Network.This plan fulfills the service function, develops the capacity of corollary equipment and controls the investment efficiently.
出处
《地下工程与隧道》
2004年第1期8-10,共3页
Underground Engineering and Tunnels