摘要
从影响火电厂建设可行性的经济效益、社会效益和环境效益3个因素出发,分别对其细分出子因素,利用多级模糊综合评判方法对电厂的选址问题进行综合评价,从可持续发展的角度找到综合效益最好的厂址,为火电厂的投资建设提供参考。
The paper is to solve the problem of power plant election by the way of multilevel fuzzy synthetic evaluation, according to the three main factors and their sub-factors which influence the feasibility of power plant construction including economic benefit, social benefit and environmental benefit. The paper contributes to the best selection of comprehensive benefits and the investment of power plant on the part of sustainable development.
出处
《现代电力》
2004年第2期27-30,共4页
Modern Electric Power
基金
河北省电力科技项目