摘要
对北仑发电厂二期工程600MW锅炉的燃煤特性、设备结构和运行条件进行分析,并通过配煤掺烧调整试验,确定了适用的煤种和燃烧器配风方式,解决了锅炉燃烧器区域严重结渣问题,实现了炉型与煤性的较佳耦合。
The fuel coal property, equipment configuration and operation conditions of 600 MW coal-fired boiler in Beilung Thermal Power
Plant Phase Ⅱ were analyzed, and through the adjustment and test of blended coal burning, the adaptable coal type and air distribution mode
of burners were determined. It resolved the serious slagging problems around the burner area of boiler and realized the better matching between
the boiler and coal property.
出处
《中国电力》
CSCD
北大核心
2004年第3期35-37,共3页
Electric Power