期刊文献+

基于风险的海洋结构物无损检测功能的分级 被引量:2

Risk based ranking of nondestructive inspection performances for offshore structures
下载PDF
导出
摘要 提出了基于风险的海洋结构物无损检测功能分级方法,采用检测概率、错误识别概率和裂纹出现概率度量检测功能,并修正了错误识别概率的取值范围。根据风险值对无损检测功能进行了分级,研究了风险值随检测概率、错误识别概率和裂纹出现概率的变化规律,分析了风险值对检测费用、维修费用及失效费用的敏感性。在此基础上,将基于风险的海洋结构物无损检测功能分级方法应用于优化检测策略,用算例证明了文中所提方法的有效性。 The traditional experience-based inspection approach incurs high costs or yields unnecessary inspections for offshore structures. To overcome these disadvantages, a risk-based ranking method is proposed to rank nondestructive inspection performances for offshore structures. The three variables of the probability of detection, the false call probability and the probability of presence of a crack are adopted for completely characterizing nondestructive inspection performances. Furthermore, the range of variation for the false call probability is corrected. The values of risk are used to rank nondestructive inspection performances. A numerical example is investigated to obtain the variation laws of the values of risk with the probability of detection, the false call probability and the probability of presence of a crack. Furthermore, the influences of different costs on the value of risk are discussed. The proposed method is then applied to select the optimal inspection strategy. The results indicate that the proposed method is very effective in selecting the optimal inspection strategy.
出处 《海洋工程》 CSCD 北大核心 2004年第1期80-87,共8页 The Ocean Engineering
基金 高等学校博士学科点专项科研基金资助项目(2000024802)
关键词 无损检测 风险 检测概率 错误识别概率 海洋结构物 nondestructive inspection risk probability of detection false call probability offshore structures
  • 相关文献

参考文献12

  • 1Wheeler T A. Risk-based ranking of dominant contributors to maritime pollution events[J]. Risk Analysis, 1993,13(2) :207-214.
  • 2Wheeler T A, Gawande K,Bespalko S. Development of risk-based ranking measures of effectiveness for the Unite States coast guard's vessel inspection program[J]. Risk Analysis, 1997,17(3):333-340.
  • 3Stewarta M G, Rosowskyb D V,Valc D V.Reliability-based bridge assessment using risk-ranking decision analysis[J]. Structural Safety, 2001,23(4):397-405.
  • 4Rouhan A ,Schoefs F. Basis for offshore NDT inspection ranking,in IMR plans[A]. Risk based inspection and maintenance plans[C]. Faber M H, Swiss Federal Institute Technology,2001:165-174.
  • 5Zheng R X,Ellingwood B R. Role of nondestructive evaluation in time-dependent reliability analysis[J].Structural Safety,1998,20(4):325-339.
  • 6Barnouin B, Lemoine L, Dover W D, et al. Underwater inspection reliability trials for offshore structures[A]. Proceedings of the 12th international conference on offshore mechanics and arctic engineering (OMAE'93)[C]. Glasgow, Scotland, 1993, 3B: 883-890.
  • 7Ayyub B M. Risk analysis and management for marine systems[J]. Naval Engineers Journal,2002,(1):181-206.
  • 8李典庆,唐文勇,张圣坤.海洋工程风险接受准则研究进展[J].海洋工程,2003,21(2):96-102. 被引量:40
  • 9Rouhan A. Etude sur les probabilités de détection des contrles non destructifs[R]. IFRENER,Rapport d' étude de contrat universitaire no 002021316 TMSI/RED/MS. En ours,2000,11.
  • 10Heasler P G, Taylor T T, Doctor S R. Statistically based reevaluation of PISC-Ⅱ round robin test data[R]. NUREG/CR-5410. Washington, DC: US Nuclear Regulatory Commission, 1993.

二级参考文献25

  • 1Ohtsubo H , Sumi Y. Committee report on risk assessment[ A]. Proceedings of the 14th international ship and offshore structures congress[ C]. Nagsaki, Japan,2000,2:1 - 41.
  • 2Moan T. Current trends in the safety of offshore structures[ A ]. Proceeding of the seventh international offshore and polar engineering conference[C]. USA, 1998, 420-427.
  • 3Bea R G. Reliability criteria for new and existing platforms[ A] .Offshore technology conference[ C]. OTC6312, 1990.
  • 4prEN 50126. Railway applications. The specification and demonstration of Reliability, Availability, Mintainability and Safety (RAMS)[S]. CENELEC, European Committee for Electrotechnical Standardisation.
  • 5Ditlevsen O. Risk acceptance criteria and/or decision optimization[ A]. 15th IABSE congress: structural engineering in consideration of economy, environment and energy[ C]. Copenhagen, 1996.
  • 6Bottelberghs P H. Risk analysis and safety policy developments in the Netherlands[J ].Journal of Hazardous Materials, 2000,71( 1-3 ) :59-84.
  • 7Harsanyi J C. Utilities, preferences and substantive goods[ M]. The United Nations University, 1992.
  • 8Okamoto K. Introduction to risk and psychology[M]. Saiensu, 1992.
  • 9Schneider J. Sicherheit und zuverlassigkeit im bauwesen, grundwissen fur ingenieure[J]. VDF, Hochschulverlag AG an der ETH Zürich, 1994.
  • 10Nadim F, Gudmestad O T. Reliability of an engineering system under a strong earthquake with application to offshore platforms[J].Structure Safety, 1994, (14) :203-217.

共引文献39

同被引文献43

  • 1谢凌云,徐刚.核燃料元件中燃料棒制造过程FMEA分析[J].核标准计量与质量,2010(1):20-25. 被引量:3
  • 2李典庆,张圣坤,唐文勇.Risk Based Optimal Inspection and Repair Planning for Ship Structures Subjected to Corrosion Deterioration[J].海洋工程:英文版,2004,18(2):185-196. 被引量:1
  • 3李典庆,张圣坤,唐文勇.基于风险的船体结构腐蚀优化检测及维修规划[J].上海交通大学学报,2004,38(11):1875-1879. 被引量:9
  • 4聂炳林.国内外水下检测与监测技术的新进展[J].中国海洋平台,2005,20(6):43-45. 被引量:18
  • 5BjΦrnΦy O H,Jahre-Nilsen C,Marley M J,et al.RBI planning for pipelines,principles and benefits[A].Proceedings of 20th International Conference on Offshore Mechanics and Arctic Engineering[C].Brazil,2001.OMAE2001-PIPE4007.
  • 6Goyet J,Rouhan A,Michael Havbro Faber.Industrial implementation of risk based inspection planning lessons learnt from experience:(1) the case of FPSO's[A].Proceedings of 23th International Conference on Offshore Mechanics and Arctic Engineering[C].Canada,2004.OMAE2004-51572.
  • 7Khan F I,Haddara M.Risk-based maintenance (RBM):a quantitative approach for maintenance/inspection scheduling and planning[J].Journal of Loss Prevention in the Process Industries,2003,16(6):561-573.
  • 8Aven T,Vinnem J E.On the use of risk acceptance criteria in the offshore oil and gas industry[J].Reliability Engineering and System Safety,2005,90(1):15-24.
  • 9Landet E,Lotsberg I,Sigursson G.Risk based inspection of an FPSO[A].Proceedings of the Annual Offshore Technology Conference (OTC)[C].Houston Texas U S A,2000.2:739-748.
  • 10Faber M H,Straub D,Goyet J.Unified approach to risk-based inspection planning for offshore production facilities[J].Journal of Offshore Mechanics and Arctic Engineering,2003,125(2):126-131.

引证文献2

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部