摘要
为了 116 10工作面生产的接续 ,田庄矿根据已有资料及邻近矿井资料 ,结合数值模拟分析提出了覆岩开采破坏规律 ,提高了煤矿开采上限。
Located in the northwest of Yanzhou coal field,the mining upper limit of section 11610 in Tianzhuang Coal Mine is anxious to be increased under a condition of near level plane in order to meet the demand of a continuous production. Through operation of three underground drilling-holes,the project scheme of disruption rule of mining capping rocks and upper limit are raised on the basis of value analogous analysis to capping rocks deformation characteristics. The analogous analysis and practical operation show that a 23 5m waterproof coal pillar in the roof is suitable to ensure production security,offering a good economic benefit.
出处
《江苏地质》
2004年第1期39-41,共3页
Jiangsu Geology
关键词
覆岩
煤矿
开采上限
数值模拟
山东充州
Cover rock
Capping mine
Mining upper limit
Numerical simulation
Yanzhou,shandong