期刊文献+

机炉压降规范及主蒸汽管道匹配准则的讨论 被引量:1

On the Norm for Pressure Difference between Boiler-turbine and Matching Criterion for Steam-generator Lead Line
下载PDF
导出
摘要 在综述火电厂机炉蒸汽初参数匹配规范现状和实践的基础上,讨论了机炉压降与主蒸汽管道压降两者涵义的差异,并借助简化的主蒸汽管道阻力计算方程,提出了与机炉压降相匹配的主蒸汽管道管径尺寸或流速核算准则. On the Basis of the status quo of the matching norm and practices for power plant boiler-turbine main steam parameters, this paper discusses the definition difference between the pressure drop of boiler-turbine and the pressure drop of steam-generator lead line, putting forward the check criteria for main steam piping diameter size which is well-matched to the boiler-turbine pressure difference with the aid of simplified equation of main steam piping resistence.
作者 张建中
机构地区 西北电力设计院
出处 《上海电力学院学报》 CAS 2004年第1期25-30,共6页 Journal of Shanghai University of Electric Power
关键词 火电厂 机组 锅炉 主蒸汽管道 匹配准则 压降规范 pressur difference between boiler-turbine pressure drop in steam-generator lead line resistance calculation equation check criterion of upper limit velocity
  • 相关文献

参考文献1

  • 1电力工业部东北电力设计院.火力发电厂汽水管道设计技术规定[S].北京:中国电力出版社,1996..

同被引文献11

引证文献1

二级引证文献1

相关作者