针对山西省万家寨引黄工程控制调度中心大楼基坑现场实际 ,确定了自然放坡与土钉墙支护相结合的施工方案 ,对其施工工艺作了介绍 。
According to the practical situations of the foundation pit work of control center building in Wanjiazhai Yellow River Diversion Project, the construction plan with combination of natural sloping and soil nailing wall is determined. Practical construction technologies are introduced, which ensure the excavation construction of foundation pit.
出处
《山西建筑》
2004年第8期23-24,共2页
Shanxi Architecture