摘要
结合秦沈客运专线及胶新铁路现场快速制梁施工经验 ,着重对梁场选址、平面布置及制梁技术要点进行详细的介绍 ,并通过分析比较 ,提出了现场预制梁施工方法的几个特点。
Combined with the rapid beam fabrication experiences in engineering of Qinhuangdao Shenyang special railway line and Jiaoxin railway the site selection, plane layout and fabrication skill are introduced in detail. Through comparative analysis the construction features of on site beam fabrication are presented.
出处
《山西建筑》
2004年第8期55-56,共2页
Shanxi Architecture