摘要
今介绍一种新的测绘横断面图操作方法.该方法不仅简单灵活,而且能提高工作效率以及保证工作质量.
A new method of surveying cross section map is introduced and the method is simple and convenient and can raise operational efficiency and work quality.
出处
《浙江水利水电专科学校学报》
2004年第1期21-22,共2页
Journal of Zhejiang Water Conservancy and Hydropower College