优化洞室大爆破定测设计 被引量:2

Surveying and plan optimized for chamber blasting
下载PDF
导出
摘要 在洞室掘进过程中,由于施工管理未到位,施工队伍技术水平较差,施工的其中一条洞室掘进控制导线与设计方位线偏差很大,导致药室的最小抵抗线由原设计的40m增大到实测的57m,而所检索、查阅的资料中,抵抗线超过45m的洞室大爆破资料极少,抵抗线超过50m的洞室大爆破的资料更是难以找到.合理调整装药结构、装药位置及条形药包的装药量,做好了药室设计与定测工作,确保洞室大爆破成功. In the process of digging excavation, a chamber under construction is become deviation with plan in chamber excavated, because of poor construction management and techniques.For this reason, the minimum burden of the chamber found out by original design of 40 m increases to the actual surveying of 57 m.However,the data for the chamber whose resisting line exceeds 45 m is rare in document retrieval,let alone that exceeds 50 m.The reasonable adjustment of charge struction,charge position,charge load of bar cartridge and optimization have been done for the design and surveying work of the chamber to insure the chamber blasting successfully.
出处 《兰州交通大学学报》 CAS 2004年第1期23-26,共4页 Journal of Lanzhou Jiaotong University
关键词 洞室爆破 药室布置 导线设计 导洞设计 爆破参数 surveying and plan chambers former chamber blasting
  • 相关文献

参考文献2

二级参考文献2

  • 1中华人民共和国煤炭工业部.支护手册[M].北京:煤炭工业出版社,1994.
  • 2中国矿业大学.井巷工程[M].北京:煤炭工业出版社,1986.

共引文献6

同被引文献7

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部