摘要
本文介绍一例利用振动沉管灌注桩处理严重不均匀土岩组合地基的工程实践,可为类似工程条件下的桩基工程参考。
This article describes one engineering example of treating severe un-balanced combined basement by way of Vibration falling piping filling pile, which could be regarded as reference for pile basement engineering under similar engineering conditions.
出处
《煤矿现代化》
2004年第2期61-63,共3页
Coal Mine Modernization