Mining rights put on auction in Xinjiang
-
1600 kt/a PTA Unit of Yishun Petrochemical Company Officially Put on Stream in Ningbo[J].China Petroleum Processing & Petrochemical Technology,2005,7(3):62-62.
-
2Sudan's Heqlig Oilfield Put on Production[J].China Oil & Gas,1999,6(3):191-191.
-
3The 160 kt/a MDI Unit Successfully Put on Stream at Wanhua Co.in Ningbo[J].China Petroleum Processing & Petrochemical Technology,2006,8(1):62-62.
-
4450 kt/a PTA Expansion Unit Put on Stream at Yangzi Petrochemical Company[J].China Petroleum Processing & Petrochemical Technology,2007,9(1):61-61.
-
5Phase I of the 600 kt/a Methanol Project at Shenmu,Shaanxi Province Put on Stream[J].China Petroleum Processing & Petrochemical Technology,2006,8(1):36-36.
-
6晴川.日本威士忌占领市场[J].世界知识画报(艺术视界),2016,0(9):63-65.
-
7The 120 kt/a Phenol/Acetone Unit at Blue Star Harbin Co.Put on Stream[J].China Petroleum Processing & Petrochemical Technology,2006,8(1):56-56.
-
8Hlako CHOMA.The impact of mining rights on the local communities in Limpopo Province, South Africa: A comparative study[J].US-China Law Review,2009,6(2):8-20.
-
9Xinjiang Hongze Mining Invests 1 billion-1.2 billion yuan in a 20,000-ton Copper Mining Project[J].China Nonferrous Metals Monthly,2012(9):8-9.
-
10Zhang Lianye and Li Yongsheng.China's Auto Industry:What to Do? Step on the Accelerator,Or Put on the Brake?[J].China's Foreign Trade,2003(1):12-14.