期刊文献+

混凝土管桩在昆明8度抗震区的设计和应用 被引量:7

Design and Application of R.C. Tubular Pile in 8 Degree Seismic Fortication Intensity Region in Kunming
下载PDF
导出
摘要 简要介绍了在昆明“湖畔之梦”工程中引进混凝土管桩所面临的问题。结合与预制方桩的比较 ,针对昆明 8度抗震设防及滇池湖畔饱和非均匀性软土地基薄壁管桩 (PTC)桩基抗震进行了专门验算。为解决地方标准 (如浙江、宁波标准 )对高烈度区限制管桩应用问题进行了探索与尝试 ,提出了相关设计建议。 The superiority of reinforced spun concrete tubular pile and the problems are introduced, which appear in project“the dream of Hupan”in Kunming.Comparing with the precast concrete square pile, the aseismatic intensity checking computations is made for the featheredged concrete tubular pile applied in the heterogeneous soft foundation near the Dianchi Lake at the 8 degree seismic fortification intensity.The problems of the first application for the concrete tubular pile in some high intensity regions restricted by some local standards(such as Zhejiang standard)are tried to solve.
作者 张志强
出处 《建筑结构》 CSCD 北大核心 2004年第4期45-47,共3页 Building Structure
关键词 混凝土管桩 昆明市 8度抗震区 软土地基 抗震设计 reinforced spun concrete tubular pile the horizontal bearing soft foundation aseismatic design
  • 相关文献

参考文献9

  • 1GB13476-1999.先张法预应力混凝土管桩().[S].,..
  • 2YBJ237—91.先张法预应力离心混凝土管桩制作技术规程().[S].,..
  • 3DJB/T15—22—98.预应力混凝土管桩基础技术规程().[S].,..
  • 4DBJTD8—92—2000.先张法预应力混凝土管桩()(图集号:2000沪G502).[S].,..
  • 5.先张法预应力混凝土管桩(图集号:99浙G22).[S].,..
  • 6DBJ02-10-99.宁波市建筑标准设计通用图集·先张法预应力混凝土管桩().[S].,..
  • 797G361.预制钢筋混凝土方桩().[S].,..
  • 8JGJ94—94.建筑桩基技术规范().[S].,..
  • 9GB50011—2001.建筑抗震设计规范().[S].,..

共引文献1

同被引文献25

引证文献7

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部