期刊文献+

陕西汉中石门水库坝后冲坑防护施工设计 被引量:1

Designing the washout pit behind Dam of Shi-Men Reservoir in Hanzhong, Shaanxi
下载PDF
导出
摘要 本工程显著特点是施工场地狭窄,周围建筑物的安全标准规定了爆破振动的速度;因此,施工期间采用有效措施解决现场准备问题;增大资源配置;提出控制爆破试验计划;仔细研究、反复修正工程计划和进度,圆满完成工程任务。 The distinct feature of the project is that it has narrow worksite, the safety standard of around buildings have determined the blasting vibrational speed. During construction period, the effective measures to solve the problem of fieldwork preparation were adopted, the collocation of resources were increased, the plan for control blasting test were maked up, the schedule of construction were investigated and modificated repeatedly, so that the project was implemented successfully.
作者 梁晖 LIANG Hui (No.3 Company of Shaanxi Cooperation of Hydraulic Construction, Shaanxi Xianyang 712000, China)
出处 《西北水力发电》 2004年第1期31-34,共4页 Journal of Northwest Hydroelectric Power
关键词 微差爆破技术 石门水库 坝后冲坑 防护施工 陕西 technology for tiny tolerance explosion Shi-Men Reservoir washout pit behing the dam construction of prevention work Shaanxi
  • 相关文献

参考文献6

  • 1国家电力公司西北勘测设计研究院 汉中石门水库管理局项目办.陕西汉中石门水库坝后冲坑防护工程技术条款[R].,2001.6.
  • 2.陕工局集团公司第三届科技教育大会论文选编[C].,2000.12.
  • 3.DL/T5144-2001.水工混凝土施工规范[S].,..
  • 4.DL/T5150-2001.水工混凝土试验规程[S].,..
  • 5张明瑶.石门水库除险加固工程I标第一枯水期监理工作报告[R].,2002.3.
  • 6武汉水利水电学院 成都科学技术大学.水利工程施工[M].水利出版社,1980.6.