三峡工程二期上游围堰防渗墙施工方法 被引量:4

Method of seepage prevention wall of construction cofferdam for the Phase Ⅱ of Three Gorge Project
下载PDF
导出
摘要 三峡二期工程上游围堰防渗墙施工综合难度国内外罕见,通过引进先进设备,采用新技术、新材料、新工艺,攻克了砂卵石漏失层、陡坡段嵌岩等一系列技术难关,圆满完成了防渗墙施工任务。为二期工程施工提供了可靠保障,并将防渗墙的施工技术提高到了一个新水平。 The construction of seepage prevention wall at upper stream side of the cofferdam for Phase II of three Gorge Project is the most difficult one all over the world. The construction is completed by using new techniques, new materials, new processes. By these measure seepage through gravel stratum, rock embedded on steep slope are overcome. The completion of the seepage prevention wall ensures the Phase II work, and promote the construction technology to a new level.
作者 何宗彬 HE Zong-bin (Gezhouba Co. LTD, Division of manucipal managment, Hubei Yichang 443302, China)
出处 《西北水力发电》 2004年第1期52-55,共4页 Journal of Northwest Hydroelectric Power
关键词 防渗墙施工 围堰 三峡水利枢纽工程 seepage prevention wall cofferdam the Three Gorge hydraulic project
  • 相关文献

同被引文献15

引证文献4

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部