高速路特大桥 T型梁现场预制具有预制规模大、工期紧、质量要求高、施工条件差等特点。文章中论述了罗长高速公路 A4 - 2合同段 T型梁现场预制施工组织及各项管理措施。
Prefabrication of large T-shape beams for large bridges over express highways is often characterized by large precasting yards,tight schedule,high quality requirements and poor working conditions.The paper presents a description of the organization and various management measures for the in-situ prefabrication of the large T-shape beams for Contract A4-2 of Luoyuan-Changle Express Highway.
出处
《中国港湾建设》
北大核心
2004年第2期39-40,45,共3页
China Harbour Engineering
关键词
T型梁
预制
施工
管理
T-shape beam
prefabrication
construction
management