建筑工程项目风险与全面风险管理 被引量:81

Construction Engineering Project Risk and Global Risk Management
原文传递
导出
摘要 建筑工程项目的启动需要经过项目立项、可行性研究、设计、项目计划等阶段。所有这些工作都是基于正常的技术、管理和组织以及对将来的情况理想估计等假设上进行的。在建筑项目的实际运行过程中,所有这些假设均有可能发生变化,而这些变化将可能使原定的目标受到干扰甚至不能实现,因此如何识别、分析、应对建筑项目风险成为建筑项目参与各方亟需妥善解决的问题。本文结合大型建筑工程项目的实际,提出了建筑工程项目全面风险管理的模型,并给出了可以在风险管理中运用的工具与方法。 To start up a construction engineering project should pass through these stages:project estab-lishing,feasibility research,designing,project planning and etc.All these work are based on the hypotheses of routine techniques,managements, organizations and future.In project executing phase,all these hypotheses are variable.These varieties will disturb the project advancing and may make the project fail. How to identify,analyze and reply project risks has become a problem for the participants to deal with properly.This paper integrates the facts of construction engineering, put forward the construction engineering total risk management' s model and the tools and means that can be used in risk managing.
作者 唐坤 卢玲玲
出处 《建筑经济》 北大核心 2004年第4期49-52,共4页 Construction Economy
关键词 建筑工程项目 全面风险管理 FIDIC 风险识别 Construction engineering risk total risk management
  • 相关文献

参考文献5

  • 1王兴华.风险管理与保险在二滩工程中的应用[J].水力发电,2002,28(7):4-8. 被引量:6
  • 2国际咨询工程师协会FIDIC.施工合同条件[M].机械工业出版社,1999年第1版..
  • 3项目管理协会PMI.项目管理知识体系指南[M].项目管理协会有限公司,2000年版.127-146.
  • 4吴泗宗 唐坤.上海海港新城大型项目进度与投资控制研院[Z].,2003..
  • 5吴泗宗 唐坤.中建8局大型建筑企业的现代化管理与现代化施工管理研究报告[R].同济大学经济与管理学院,2003..

共引文献5

同被引文献255

引证文献81

二级引证文献257

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部