摘要
第二松花江哈达山水利枢纽建成后,其主要功能为向外调水。因此,将长期下泄"枯水"流量。文中通过研究枢纽对下游哈达山至三岔河口河段河床演变及通航产生的影响,为航道部门寻求维持目前航道现状条件下的补偿措施提供了理论支持。
After the completion of the 2nd Hadashan Hydro-junction Project of Songhuajiang River,its main function is to transfor water to the West of Jilin Province.As a result,it will discharge at 'low water' continuously.From analysis of the influence of the hydro-junction on the reach from Hadashan to Sancha River Mouth and the navigation,the theoratical basis is provided for compensation of the waterway existing conditions.
出处
《水道港口》
2004年第1期21-24,共4页
Journal of Waterway and Harbor
关键词
水利枢纽
河床演变
通航条件
水流
Hydro-junction
river evolution
navigable conditions
current