本文简要介绍了乌江索风营电站地下厂房的开挖支护施工程序、方法和现场监控量测情况,可以在复杂岩溶地区大型地下洞室施工借鉴。
The Suofengying water power station is situated in the main stream of Wujiang river, the underground building is situated in karst area. The geologic structure is complex. The paper intrcdaces the procedure and the method of underground building excavation and anchor support, the site survey for inspection and control.
出处
《东北水利水电》
2004年第5期35-36,共2页
Water Resources & Hydropower of Northeast China
关键词
索风营电站
地下厂房
开挖
锚喷支护
监控量测
underground building
excavation
anchor support
Suofengying water power station