摘要
潮州供水枢纽正常蓄水后 ,库水位高出竹竿山以南库段两岸 0 .5~ 3 .0m ,存在浸没可能 ,直接关系到工程的成败 ,直接影响到库区两岸人民群众的正常生活和生产活动。在详尽的地质调查、地下水调查、建筑物调查、农作物调查的基础上 。
After the normal storage in the Chaozhou Water Supply Junction Project starts, the reservoir water level will be higher about 0.5m to 3m than the grou nd surface behind the banks of reservoir from the south areas to the Zhugan Moun tain. The happening of submersion is possible, and it will affect the success of the project and the normal living and working of the local people living behind the banks. Having made a geological survey on groundwater level, buildings and crops, the author makes a suggestion about judging criterion of immersion.
出处
《广东水利电力职业技术学院学报》
2004年第1期14-18,共5页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering