摘要
介绍了判断轻型井点降水是否发生透点现象的方法 ,从施工现场地质条件、降水设备及井点管长度误差三方面 ,就发生透点的原因进行了分析 。
The determination method for penetration points in light well dewatering is introduced and from three aspects: site geological conditions, dewatering equipments and error in pipe length the reasons caused the penetration points are analyzed; at the same time corresponding prevention and treatment measures are proposed.
出处
《山西建筑》
2004年第10期23-23,共1页
Shanxi Architecture