摘要
介绍了广州东部水厂沉井工程施工概况 ,结合该工程特点 ,提出了“三个阶段 ,一个全过程”的控制工艺流程 ,并对其抽垫木、沉井下沉阶段的施工工艺措施作了详细阐述。
The general situations of the sunk well work of one water plant in the east of Guangzhou are introduced and according to the features of this work corresponding technological process is proposed; at the same time according some details related construction technologies are introduced.
出处
《山西建筑》
2004年第10期61-62,共2页
Shanxi Architecture