摘要
对章丘电厂2台锅炉由于设计问题,炉膛出口烟温偏离设计值,汽温严重偏低的原因进行了分析和探讨,并根据实际情况提出了解决方法,以便提高调峰机组的安全经济运行。
The problems in design of boilers in ZhangQiu Power Plant lead to d eviation of furnace exit from designed value,rather low steam temperature,causes of the main steam temperatures of boilers being on low side are analyzed.On bas is of actual operation conditions, solutions are proposed for such problem,thus improving the operation economics of peaking units.
出处
《山东电力技术》
2004年第3期65-68,共4页
Shandong Electric Power