摘要
针对国内建设垃圾焚烧电站的实际情况,研究了我国垃圾焚烧电站的模式,认为其核心涉及电站工艺流程;综合了电站设计、投产和运行经验及正在运行中的国内外垃圾焚烧电站的公开数据。结合深圳南山垃圾焚烧电站工程的设计,介绍垃圾焚烧电站的参数选择、系统拟定、设备配备、厂房布置、运行方式等设计特点。
In light of the construction conditions of garbage incineration power plant in China, its pattern is comprehensively studied. It is held that, the major problem involves the technological process of power plant. This paper sums up the experiences of design, commissioning and operation of garbage in cineration power plant, and the open data of garbage incineration power plant in operation at home and abroad; and combining with the design of Shenzhen Nanshan Garbage Incineration Power Plant briefs the parameters selection, system decision, equipment match, main building layout and operation mode etc. design features of garbage incineration power plant.
出处
《中国电力》
CSCD
北大核心
2003年第8期12-15,共4页
Electric Power