摘要
本文运用模糊集理论建立了电力系统模糊多目标无功规划模型和ALM 求解方法。
In this paper,a model of reactive power planning based on fuzzy multiobjective planning method and a solution of Augmented Lagrange Method(ALM)are presented.
出处
《石家庄铁道学院学报》
1992年第3期49-56,共8页
Journal of Shijiazhuang Railway Institute
关键词
模糊规划论
无功规划
电力系统
规划
fuzzy planning
reactive power planning
Augmented Lagrange Method(ALM)