期刊文献+

铁路上海站今昔 被引量:5

the past and today of Shanghai Railway Station
下载PDF
导出
摘要 新客站立面进行改造工程采纳了建筑师提出的综合改建方案。新增空间主要以钢结构、鱼腹式钢索铝合金框架幕墙系统及中空玻璃构建,建筑师参与了结构构造、幕墙体系、设备安装、车站站名、标识等的细部设计及协调,将建筑美学、结构计算、设备系统与幕墙技术等各种要素加以综合,达到了预期的改建构想。 the comprehensive renovation proposals from architects were applied to the renovation project of the elevation of the new railway station. Newspace is built with steel structure, aluminum frame curtain wall system with fish-bellied steel cable and insulation glass unit. Architects participated in thedesign and correspondence of structure system, curtain wall system, equipment installation and sign boards, which combines the architectural aesthetics,structure computation, equipment system, and curtain wall technology to realize the expect of renovation.
出处 《建筑创作》 2004年第4期80-91,共12页 ArchiCreation
关键词 客站 上海 钢结构 铝合金幕墙 中空玻璃 建筑美学 建筑形态 comprehensive renovation,design and correspondence,architectural form,waiting environment,commercial operation
  • 相关文献

同被引文献19

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部