摘要
就YQ - 2 4 0 /3 82 -M型循环流化床锅炉试运行过程中出现的炉膛摆动、炉墙振动和一、二次风系统喘振问题 ,从几个方面进行简要分析并给出了一些处理办法。
This paper discusses furnace swing,furnace wall vibration and surge problem of primary and secondary air system in the test operation for YQ-240/3.82-M circulating fluidized bed boiler.It also puts forward some disposals in several aspects.