电力市场和过渡期电力系统可中断负荷管理(二)——可中断负荷运营 被引量:26

Interruptible load management in power market and interim system Part 2 Operation of interruptible load
下载PDF
导出
摘要 重点介绍可中断负荷的运营情况,这是关系到其能否发挥作用的重要因素。对电力市场和过渡期电力系统两种情况给予分析。首先介绍了在电力市场中以电价为核心的可中断负荷实行方式,包括中断合同类型、期权定价以及负荷侧参与市场竞价的情况;然后阐述了过渡期系统可中断负荷的中断条件、优化调度、实施障碍等;最后提出了该领域急需研究的问题。 The operation of interruptible load is focused on.The operation mode is an important factor affecting its benefit,which is discussed for power market and interim system separately.The interruptible load implementation in power market based on price is introduced,including contract types,option pricing and demand side bidding.The interruptible conditions,optimal dispatch,application obstacles in interim system are also discussed.The problems to be urgently studied are presented.This project is supported by the key project of National Nature Science Foundation of China(59937150).
出处 《电力自动化设备》 EI CSCD 北大核心 2004年第6期1-5,共5页 Electric Power Automation Equipment
基金 国家自然科学基金重点资助项目(59937150)
关键词 电力市场 可中断负荷 合同 需求侧报价 power market interruptible load contract demand side bidding
  • 相关文献

参考文献31

  • 1GEDRA T W,VARAIYA P P. Markets and pricing for interruptible electric power[J]. IEEE Trans. on Power Systems, 1993,8 (1): 122 - 128.
  • 2DOUDNA J H. Overview of California ISO summer 2000demand response programs [A]. Proceedings of Power Engineering Society Winter Meeting [C]. Columbus,Ohio USA: IEEE, 2001. 228- 233.
  • 3New York Independent System Operator,NYISO ancillary services manual, 1999 [EB / OL]. http: //www.nyiso.com,2002-09-15.
  • 4Power Pool of Alberta,Voluntary load curtailment program, 2001 [ EB / OL ]. http://www.powerpool.ab.ca, 2003-07-10.
  • 5CHEN C S,LEU J T. Interruptible load control for Taiwan Power Company[J]. IEEE Trans. on Power Systems, 1990,5(2) :460-465.
  • 6FAHRIOGLU M,ALVARADO F L. Designing incentive compatible contracts for effective demand management[J]. IEEE Trans. on Power Systems,2000,15(4): 1225-1260.
  • 7FAHRIOGLU M,FERNANDO L. Using utility information to calibrate customer demand management behavior models[J]. IEEE Trans. on Power Systems,2001,16(3):317-322.
  • 8GEDRA T W. Optional forward contracts for electric power markets [J]. IEEE Trans. on Power Systems,1994,9(4): 1766-1773.
  • 9CATER J C. Valuing options for electric power resources [J]. The Electricity Journal, 1995,8 (3): 43 - 49.
  • 10STRAUSS T P,OREN S S. Priority pricing of interruptible electric power with an early notification option[J]. The Energy Journal, 1993,14(2): 175-195.

二级参考文献13

  • 1王锡凡.包含多个水电机组的随机生产模拟[J].西安交通大学学报,1985,(4).
  • 2王锡凡.电力系统优化规划[M].北京:水利电力出版社,1991..
  • 3言茂松.电能价值多重分析和分时电价预测[M].北京:中国电力出版社,1998..
  • 4曾鸣,S.Oren.电网削峰最优计划与调度数学模型及其应用[J].中国电力,1997,30(1):58-60. 被引量:7
  • 5Juan J,IEEE Trans Power Systems,1997年,12卷,4期,1561页
  • 6Wang Xifan,Modern Power System Planning,1994年
  • 7王锡凡,电力系统优化规划,1990年
  • 8王锡凡,中国电力,1999年,32卷,2期
  • 9Wang Xifan,IEEE Trans Power Systems,1988年,3卷,3期,823页
  • 10王锡凡,西安交通大学学报,1985年,4卷

共引文献51

同被引文献271

引证文献26

二级引证文献204

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部