摘要
介绍了管棚支护、旋喷桩支护、立管桩过松散沙、流沙的新工艺及需要采取的专门技术措施 。
In shaft sinking,tubing support ,rotary shotcrete piling and vertical pipe pipelining methods are used to enable the shaft to psaa through loose and ruick sand layers.The paper presents an introduction to the new method and the special technical measures adopted,as well as the experience of shaft sinking by using this method.
出处
《水力采煤与管道运输》
2004年第2期11-14,共4页
Hydraulic Coal Mining & Pipeline Transportation