期刊文献+

螺旋钻孔灌注桩的施工质量控制

下载PDF
导出
出处 《北京地质》 2004年第2期18-24,共7页 Beijing Geology
  • 相关文献

参考文献6

  • 1Roberts, T. (1998). Quality Control for Augered Cast-In-Place Piles in Texas and Louisiana. Proceedings, The Deep Foundations Institute's Augered Cast-In Place Piles Committee Specialty Seminar: Augered Cast-In-Place Piles, Houston, TX,USA, p. 95-111.
  • 2Rausche, F., Likins, G. and Shen, R. K. (1992). Pile Integrity Testing and Analysis. Proceedings, Fourth International Conference on the Application of Stress-Wave Theory to Piles, The Hague, The Netherlands.
  • 3Likins, G., Piscsalko, G. and Cole, C. (1998). Pile Installation Recorder Tests for ACIP/CFA Piles. Proceedings, The Deep Foundations Institute's Augered Cast-In Place Piles Committee Specialty Seminar: Augered Cast-In-Place Piles, Houston, TX, USA, p. 69-92.
  • 4Rioul, O. and Vetterli, M. ( 1991 ). Wavelets and Signal Processing. IEEE Signal Processing Magazine. Vol. 8, no. 4.October, p. 14-38.
  • 5Ransche, F. , Goble, G. and Likins, G. ( 1985 ). Dynamic Determination of Pile Capacity. ASCE Journal of Geotechnical Engineering, Vol. 111, March 1985.
  • 6Hussein, M. , Likins, G. , and Rausche, F. , (1996). Selection of a Hammer for High-Strain Dynamic Testing of Cast-In-Place Shafts.. Proceedings, Fifth International Conference on the Application of Stress-Wave Theory to Piles, Orlando, Florida, USA.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部