摘要
本文系井泵并联工况点的图解法和电算程序,使用语言为 BASIC,在 APPle机上调试、使用。它可以简便、迅速地提供设计计算结果。
This qaqer introduces a method of diagram Calculating and Computer program of calculating well pump parallel Connestion work statc point,The program language is BAsic it can be used on Apple computes,and Conueniently ofaers an accurate result of design and Calculation.
出处
《华北水利水电学院学报》
1992年第1期31-37,共7页
North China Institute of Water Conservancy and Hydroelectric Power