期刊文献+

三峡工程二期深水围堰主要技术问题的研究 被引量:2

A Study on Main Technical Problems for the Second Stage Cofferdam of the Three Gorges Project
下载PDF
导出
摘要 本文首先对三峡工程二期深水围堰的主要技术问题进行了分析,并简要介绍了围堰各种填料特性和防渗墙材料的研制情况,围堰应力应变状态的数值分析和围堰边坡稳定可靠度分析,大型离心机模型试验的成果等;通过几年来的研究,基本上解决了长期疑惑的一些主要技术难点,所得的成果,不仅对三峡和类似的工程有实用价值,而且对发展学科也起到了推动作用。 In this paper, the complexity and main technical difficulties about the second stage cofferdam is described firstly . Then , brief of the research results on properties of various fills and new impervious materials, the numerical analysis of stress and strain for diaphragm wall, the centrifuge tests, the reliability analysis and others are introduced.Based on those research works, some main technical problems, which were thrown into confusion long, were basically solved or clarified.All research results are not only meaningful for the Three Gorges Project and other analogous projects, but helpful for developing related science field.
作者 包承纲
出处 《长江科学院院报》 CSCD 北大核心 1992年第A06期22-26,34,共6页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 围堰 应力应变 离心模型 Three Gorges Project coifferdam weathered granite sand diaphragm numerical analy- sis reliability analysis centrifuge test
  • 相关文献

同被引文献16

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部