摘要
运用系统工程思维方法,通过采矿方法的资料收集、用模糊数学方法选择采矿方法的类型、采矿方法方案的设计以及用非线性规划方法确定采矿方法的使用范围的研究等4个步骤,进行采矿方法系统的选择,其定量选择的结果是较全面、科学、准确的。所选择的采矿方法为东坪金矿带来了可观的经济效益。
With the application of system engineering and fuzzy mathematics, the appropriate mining methods as well as mining system designs are chosen from a collection of mining methods.The application field is defined through non-linear planning. As a result, the right choice could be made with good reliability, bringing considerable economic benefits to the Dongping Gold Mine.
关键词
金矿床
采矿法
系统工程
模糊数学
Mining method design, Systems engineering, Fuzzy mathematics, Non-linear planning