摘要
介绍岭澳核电站反应堆压力容器和蒸汽发生器制造及安装工艺的改进,并分析工艺改进的优点以 及对工程建设所造成的影响。
The fabrication and installation technology improvement for primary equipment reactor pressure vessel and steam generators on Ling'ao Nuclear Power Station is given. The advantage of these improvement and impacts on the construction of Ling'ao Nuclear Power Station is analyzed.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2004年第3期249-251,共3页
Nuclear Power Engineering