摘要
以典型工程实践为例,分析了某斜拉桥竣工后与设计结构体系不符的原因,介绍采用压重与调索处理后使体系得以恢复的处理方法。
An analysis was made of causes for the inconformity of a completed bridge to the designed structural system. An introduction is given to treatment method for restoration of the structural system by surcharge and cable adjustment.
出处
《铁道建筑技术》
2004年第2期35-37,共3页
Railway Construction Technology