凌津滩水电站泄洪闸工作闸门及启闭机设计特点 被引量:2

Design features of flood-releasing service gate and hoist for Lingjintan Hydropower Station
下载PDF
导出
摘要 凌津滩水电站首次采用大型盘香式启闭机启闭大型平面工作闸门,取消常规布置中的混凝土高排架,加快了工程进度,实现提前6个月发电,取得了非常好的经济效益与社会效益。自1998年下闸蓄水以来,泄洪闸已经安全运行了近5年时间,工作闸门及启闭机经历了各种洪水的考验,总体运行情况基本良好,可供类似工程借鉴。 This paper outlines the first use of large disc-type hoist for operating the large plane gate of the Lingjintan Hydropower Station. In addition, the cancellation of concrete trestle stand usually on the concrete dam brought about a speed-up of construction progress and 6-month early first power generation as well as good economic and social benefits. During five-year operation since 1998, the flood-releasing gate and hoist have experienced all kinds of flood and maintained a safe and reliable operation, presenting a sound system operation. This paper summarizes the design features of the operating flood-releasing gate and hoist, which can use for reference for the colleagues in the work of the similar projects.
出处 《水力发电》 北大核心 2004年第4期50-52,共3页 Water Power
关键词 盘香式启闭机 平面工作闸门 凌津滩水电站 disc-type hoist plane operating gate Lingjintan Hydropower Station
  • 相关文献

参考文献2

  • 1中国水利水电科学研究院.凌津滩水电站泄洪闸平面闸门流激振动试验研究报告[R].,1996..
  • 2中国水利水电科学研究院.凌津滩水电站泄洪闸减压模型试验报告[R].,1995..

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部