期刊文献+

上海外环沉管隧道大型管段浮运方法 被引量:23

The Floating Transport Method of Large Elements Employed for Shanghai Out-ring Immersed Tube Tunnel
下载PDF
导出
摘要 管段浮运是沉管隧道施工的重要环节 ,本文以上海外环沉管隧道重量超过 4 10 0 0t的管段浮运为工程背景 ,首先介绍管段拖曳阻力的模型试验 ,然后说明拖轮配备、浮运工艺流程及浮筒助浮措施 ,最后简述黄浦江航道交通管制方法。 The floating transport of elements is the key step in the construction of immersed tube tunnel. In this paper, the towing of element,weighing over 41000t, of Shanghai Outer-ring immersed tube tunnel are taken as an engineering background. First, the laboratory test of model for determining towing force is briefed. Second, the technique and program of element towing,tug-boat arrangement and assistant-floating of element through pontoons are introduced. Finally, the method of waterway control in the Huangpu river during element towing is presented.
作者 潘永仁
出处 《施工技术》 CAS 北大核心 2004年第5期52-54,共3页 Construction Technology
关键词 沉管隧道 管段浮运 航道交通管制 immersed tube tunnel element towing waterway control
  • 相关文献

同被引文献165

引证文献23

二级引证文献167

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部