摘要
冬季,在冰封的江面上,采用控制爆破法成功地拆除了一座老龄特大铁路钢桥,为日渐增多的旧桥拆除工程提供了一种较好的施工方法。
An aged steel railway major bridge was demolished successfully with controlled blasting method over the icebound river in winter. The successful construction herewith provides a fairly good method for demolishing the increasing amounts of aged bridges in the future.
出处
《桥梁建设》
EI
CSCD
北大核心
2004年第3期54-57,共4页
Bridge Construction
关键词
钢桥
铁路桥
拆除爆破
施工方法
安全措施
steel bridge
railway bridge
demolishing by blasting
construction method
safety measure