摘要
介绍了秦沈客运专线24m单线箱梁的预制施工,详细阐述了箱梁预制的关键技术,并提出了新型的模板设计和工艺程序,为箱梁预制施工提供了新经验。
It introduces the pre-manufacturing construction of 24M single - track trunk beam of Qin Shen special passenger line and key technology of truck beam pre-manufacturing. It puts forward the new type of simulation design and technology sequence, which has provided new experience for truck beam pre-manufacturing.
出处
《上海铁道科技》
2004年第2期27-28,38,共3页
Shanghai Railway Science & Technology
关键词
客运专线
后张法
箱梁预制
Special Passenger Line After Tension Truck Beam Pre-Manufacturing