摘要
通过工程现场实测成果 ,研究分析了堆载预压软基处理过程中孔隙水压力、地表沉降及分层沉降随时间、工况的变化规律。该项监测工作对施工起到了一定的指导作用 。
On the basis of measured data this paper deals with changes in pore water pressure,ground subsidence and layering subsidence with time and constuction during stacking precompaction and soft ground treatment.Monitoring the changes is of importance to engineering check.
出处
《四川地质学报》
2004年第2期104-106,共3页
Acta Geologica Sichuan
关键词
堆载预压
软基处理
孔隙水压力
分层沉降
监测
stacking precompaction
soft ground treatment
pore water pressure
layering subsidence
monitoring