期刊文献+

Collaborative Problem in Multi-agent System 被引量:1

Collaborative Problem in Multi-agent System
下载PDF
导出
摘要 In the MAS, system goal task can be decomposed into many transactions, which will be achieved by special agents distributed in different physical space. Due to complex coupling relations among transactions, transactions may form Waiting-Circle resulting in deadlock. Concerning the problem, this paper proposes two theorems developed for Waiting-Circle detection in transaction set and ensures the implement of goal task decomposition result. Furthermore, Circle-First Search is put forward to search all of the Waiting-Circle, which prnvide the basic guideline for decomposing goal task again and eliminate Waiting-Circle. In the MAS, system goal task can be decomposed into many transactions, which will be achieved by special agents distributed in different physical space. Due to complex coupling relations among transactions,transactions may form Waiting-Circle resulting in deadlock. Concerning the problem, this paper proposes two theorems developed for Waiting-Circle detection in transaction set and ensures the implement of goal task decomposition result. Furthermore, Circle-First Search is put forward to search all of the Waiting-Circle, which provide the basic guideline for decomposing goal task again and eliminate Waiting-Circle.
出处 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第2期191-195,共5页 哈尔滨工业大学学报(英文版)
基金 Sponsored by the High-Tech Research and Development Program of China (Grant No. 2001AA412210) Spaceflight Support Technology Fund Project (Grant No. 2001-HT-HGDO1)
关键词 MAS waiting-circle circle-first search 多agent系统 等待周期 周期先行搜索 协作机制
  • 相关文献

参考文献8

  • 1LI Fujun.Research on Distributed Large-Scale Turbine Scheme Design System[]..2001
  • 2Bond A H,Gasser L.An Analysis of Problems and Research in DAI[].Readings in Distributed Artificial Intelligence.1988
  • 3.Multi-Agent Systems: A Modern Introduction to Distributed Artificial Intelligence[]..1999
  • 4Dembo A,Zeitouni O.Large Deviations Techniques and Applications[]..1998
  • 5BARBER K S,LIU T H,RAMASWAMY S.Contlict detection during plan integration for multi-agent systems[].IEEE Transactions on Systems Man and Cybernetics.2001
  • 6JENNINGS N R.Coordination techniques for distributed artificial intelligence, in foundations of distributed artificial intelligence[].Sixth-Generation Computer Technology Serles.1996
  • 7Shakshuki E,Ghenni wa H,Kamel M.A Multi-agent System Ar-chitecture for Information Gathering,Database and Expert Sys-tems Applications2000[].ProceedingthInternational Work-shop on.2000
  • 8Xu Xu-song.Introduction of Data Structure &Algorithm[]..1996

同被引文献10

  • 1林剑柠,吴慧中.基于遗传算法的网格资源调度算法[J].计算机研究与发展,2004,41(12):2195-2199. 被引量:70
  • 2KELLER H.STRUSEVICH V A.Scheduling problems for parallel dedicated machines under multiple resource constraints[J].Discrete Applied Mathematics,2004,133:45 -66.
  • 3FATEMI GHOMI S M T,ASHJARI B.A simulation modle for multi-project resource allocation international[J].Journal of Project Management,2002,20:127-130.
  • 4SABRINA F,NGUYEN C D,PLATT S J D,et al.Processing resource scheduling in programmable networks[J].Computer Communications,2005,28:676-687.
  • 5MILATOVIC M,BADIRU A B.Applied mathematics modeling of intelligent mapping and scheduling of interdependent and multi-functional project resources[J].Applied Mathematics and Computation,2004,149:703-721.
  • 6王小平,曹立明.遗传算法-理论、应用与软件应用[M].西安:西安交通大学出版社,2002.
  • 7XU Zhihong,HOU Xiangdan,SUN Jizhou.An algorithm-based task scheduling in grid computing[C]//CCECE 2003-Canadian Conf on Electrical and Computer Engineering,Montreal,Canada:[s.n.],2003.
  • 8REMY J.Resource constrained scheduling on multiple machines[J].Information Processing Letters,2004,91:177-182.
  • 9GOLENKO-GINZBURG D,GONIK A,LASLO Z.Resource constrained scheduling simulation model for alternative stochastic network projects[J].Mathematics and Computers in Simulation,2003,63:105-117.
  • 10GHOSH DASTIDAR S,NAGI R.Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs[J].Computers & Operations Research,2005,32:2987-3005.

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部