摘要
通过对浃里陈大桥桥头试验段的真空度、地下水位、流量、孔隙水压力、地表沉降等现场监测结果的分析 ;阐述了真空堆载联合预压的联合机理 ,真空预压与堆载预压的联合方式不是真空荷载与堆载荷载的叠加 ,而是真空预压引起的孔压差与堆载压力引起的孔压差的叠加。试验结果表明 ,用真空堆载联合预压法处理软基是极为有效的。
The observation results of the bridge head experimental site of Jialichen Bridge are analyzed such as vacuum degree,ground water table,flowrate,pore water pressure and surface settlement.The combined mechanism of vacuum combined with surcharge preloading is discussed.It is not the way of the vacuum loading combined with surcharge loading but the the way of pore water pressure difference caused by vacuum preloading combined with the the pore water pressure difference caused by surcharge loading.The testing results show that soft foundation treated by vacuum combined with surcharge preloading is very effective.
出处
《工业建筑》
CSCD
北大核心
2004年第5期40-43,共4页
Industrial Construction