摘要
对石横电厂1号机冷水塔存在的问题进行了分析,介绍了该厂对冷水塔实施改造与施工的技术方案及过程,通过性能试验分析了增容改造前、后的运行状况,证明改造提高了冷水塔的冷却能力,产生了可观的经济效益。
The existing problems of Cooling Tower for NO. 1 Turbine in Shi Heng power plant are analyzed in the paper, and the process and technical solution for retrofitting it are briefly introduced. The performance of the unit's is compared here by performance tests before and after its capacity enlargement. It's been proved that the cooling capacity of the tower is increased and considerable economic benefit gained.
出处
《电力设备》
2004年第5期62-64,共3页
Electrical Equipment