期刊文献+

厦门海底隧道的流固耦合分析 被引量:81

Coupled fluid-mechanical analysis of Xiamen subsea tunnel
下载PDF
导出
摘要 为了验证厦门海底隧道最小顶板厚度比设计厚度减小时隧道的稳定性。在厦门海底隧道轴线的地质剖面图上 ,选取了 4个典型剖面 ,根据设计方案 ,将隧道轴线高程比原设计升高 4m ,依据流固耦合理论 ,应用三维快速拉格朗日法进行数值分析。从隧道轴线升高 4m时 ,开挖后的应力分布、洞周位移、塑性区、孔隙水压力分布等结果 ,可以得出将设计方案的轴线位置升高后 ,隧道是稳定的。同时 ,得到一些对后续施工和其他工程有一定的指导意义的有益结论。 In order to verify the stability and rock cover of Xiamen subsea tunnel which is under design now. According to coupled fluid-mechanical theorem, FLAC^(3D) (Fast Lagrangian Analysis of Continua in 3 Dimensions) numerical analysis for 4 profiles has been done along the longitudinal of the tunnel. Based on original design of the tunnel, rock covers with a decrease of 4 m is considered in the numerical simulations. From the numerical results of stress distribution, displacements,plastic zones of rock mass and pore-pressure distributions after excavation with rock cover decreasing 4 m,it can be concluded that the tunnel is stable even the rock cover of the subsea tunnel decreases 4 m compared to the original design elevation. Some conclusions are obtained which are useful for the future construction and other rock engineering.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2004年第3期397-401,共5页 Chinese Journal of Geotechnical Engineering
基金 国家自然科学基金资助项目 (50 3790 52 50 0 0 4 0 0 7)
关键词 厦门市 海底隧道 流固耦合 三维快速拉格朗日法 稳定性 Xiamen subsea tunnel coupled fluid-mechanics theorem FLAC^(3D) stability
  • 相关文献

参考文献11

  • 1ItascaConsultingGroup Inc.FLAC3D使用手册[M].USA,1999..
  • 2Dahlo T S, Nilsen B. Stability and rock cover of hard rock subsea tunnels [J]. Tunneling and Underground Space Technology,1994,9(2): 151 - 158.
  • 3Einar Broch,et al. Support of large rock caverns in norway[J].Tunneling and Underground Space Technology, 1996,11( 1 ): 11- 19.
  • 4赵阳升,杨栋,郑少河,胡耀青.三维应力作用下岩石裂缝水渗流物性规律的实验研究[J].中国科学(E辑),1999,29(1):82-86. 被引量:68
  • 5王瑗 徐志英 速宝玉.复杂裂隙岩体渗流与应力弹塑性全耦合分析[J].岩石力学与工程学报,1999,18(2):1-5.
  • 6Hart R D, Fully A. Coupled thermal - mechanical - fluid flow model for nonlinear geologicsystem(PH D Thesis)[D]. Univ of Minesota, 1981.
  • 7李术才 邱祥波.厦门暗挖海底隧道方案最小安全顶板厚度研究[R].武汉:中国科学院武汉岩土力学研究所,2002..
  • 8Chen X, Tan C P, Haberfield C M. Numerical evaluation of the deformation behaviour of thick walled hollow cylinders of shale [J]. International Journal of Rock Mechanics and Mining Sciences, 2000,37(6) :947 - 961.
  • 9Hakami H. Rock characterisation facility (RCF) shaft sinking numerical computations using FLAC[ J]. International Journal of Rock Mechanics and Mining Sciences, 2001,38( 1 ): 59 - 65.
  • 10盛金昌,速宝玉,王媛,詹美礼.裂隙岩体渗流-弹塑性应力耦合分析[J].岩石力学与工程学报,2000,19(3):304-309. 被引量:33

二级参考文献16

共引文献222

同被引文献693

引证文献81

二级引证文献653

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部