紫坪铺水利枢纽引水系统取消厂前伸缩节研究 被引量:6

Study on the Replacing Expansion Joint in Water Diversion System in Zipingpu Water Conservancy Project
下载PDF
导出
摘要 结合紫坪铺水利枢纽工程的实际情况 ,采用三维有限元方法对该工程发电引水系统取消伸缩节的可行性进行了研究。计算结果表明 ,主厂房上游永久分缝处以一段垫层管代替常规伸缩节 ,结构位移和应力完全可以满足使用要求 ,从而达到了取消伸缩节。 By integrating with the actual situation of Zipingpu Water Conservancy Project, feasibility study on replacing expansion joint in the hydropower project water diversion system is carried out by using three dimensional FEM. The results show that replacing conventional expansion joint by penstocks with cushion layer at the upper stream permanent joint of the main workshop can meet the requirements of structural displacement and stress. Thus, it is feasible to replace expansion joint thus to save the project cost.
出处 《中国农村水利水电》 北大核心 2004年第6期72-74,共3页 China Rural Water and Hydropower
关键词 水电站厂房 伸缩节 垫层管 有限元法 hydropower workshop expansion joint penstocks with cushion layer FEM
  • 相关文献

参考文献3

二级参考文献1

  • 1董哲仁.下游坝面压力管道的强度安全系数[J]水利水电技术,1988(10).

共引文献52

同被引文献47

  • 1王春涛,李振富.万家寨水电站取消发电引水管道伸缩节的焊接时机选择[J].水力发电学报,2004,23(4):55-59. 被引量:6
  • 2傅金筑,张淑婵.李家峡水电站钢管取消伸缩节论证[J].青海水力发电,1994(3):5-10. 被引量:2
  • 3刘宪亮,董毓新,何长利.大型坝后式水电站厂坝联结形式的优选[J].水利学报,1995,27(8):39-45. 被引量:5
  • 4吴海林,伍鹤皋,张伟,王从保.水电站厂坝联结形式与取消伸缩节研究[J].水力发电学报,2006,25(2):118-122. 被引量:13
  • 5李佛炎.五强溪水电站压力钢管取消伸缩节可行性研究报告[R].能源部水利部中南勘测设计院,1990.
  • 6Dai Huichao,Tian Bin.Design Calculation of"Soft" Gasket in Penstock Intended for Replacement of the Ex-pansion Joint in.Place of Abutment of Dam to Power House[C]//New Developments in Dam Engineering-Wieland.London:2004:273-280.
  • 7邱彬如.安康水电站运转期坝体温度变形计算和取消钢管伸缩节的分析.水利水电勘测设计,1986,(1):15-160.
  • 8董哲仁.五强溪水电站取消厂坝间钢管伸缩节论证报告[R].中国科学院水利水电科学研究院结构材料所,1989.
  • 9傅金筑.张淑婵.黄河李家峡水电站发电引水钢管取消伸缩节论证报告[R].能源部水利部西北勘测设计研究院,1994.
  • 10张淑婵,张文辉,傅金筑.李家峡水电站发电引水钢管取消伸缩节观测测试计算论证研究报告[R].国家电力公司西北勘测设计研究院,2000.

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部