摘要
本文以沈大高速公路改扩建工程路面基层施工为例,简要叙述了施工过程中各项试验检测指标的控制及注意事项。
This paper takes rebulding engineering roadsnrface(shenyang to dalian)for example, briofly ckals with the control and no-
ticeable items of survey -- measure and trial quotas in the process of construction.
出处
《辽宁省交通高等专科学校学报》
2004年第2期20-21,共2页
Journal of Liaoning Provincial College of Communications
关键词
路面基层
试验检测
注意事项
base layers of road surface
trial
survey and ueasruewent
noticeable items