摘要
针对漳州港 4 #、5 #泊位抛石基床爆夯工序 ,简单介绍爆夯施工准备阶段、实施阶段目标及措施 ,分析爆夯基床的密实效果以及对周围环境的影响。
In explosive ramming of rubble bed of 4# & 5# berths of China Merchants Zhangzhou Development Zone, it briefly introduces the objective and measures at preparation & implementation stages respectively. The consolidation effect of explosive ramming of foundation bed and influences to sorrounding environment are analyzed.
出处
《港工技术》
北大核心
2004年第2期30-32,共3页
Port Engineering Technology