大型项目中多级网络计划的编制与优化 被引量:7

Organizing and optimizing comprehensive network plans
下载PDF
导出
摘要 多级网络计划能快速地处理层次复杂、作业数较多、动态调整要求高的项目计划。为有效控制大型复杂建设工程项目的进度,采取多级网络计划的方法,分级编制进度计划,既可以将其分解成若干个独立网络,又可以在需要的时候将多个相互有关联的独立网络计划采用搭接关系综合成一个多级网络计划系统,并对其做优化设计。 Comprehensive network plans can handle construction project plan rapidly which is complex levels, a large amount of work to do and requires developmental adjustment. In order to control progress of complex construction project, in this article, authors take the method of comprehensive network plans to organize different level progress plans. We may not only divide it into a lot of independent network, but also combine many independent network into a comprehensive network plans system whenever we need, and then optimize it.
出处 《黑龙江工程学院学报》 CAS 2004年第2期42-44,共3页 Journal of Heilongjiang Institute of Technology
关键词 网络计划 网络计划优化 网络计划编制 network plan optimised network plan organized newtork planw`
  • 相关文献

参考文献4

二级参考文献4

  • 1中国建筑学会建筑统筹管理研究会.中国网络计划技术大全[M].北京:地震出版社,1992..
  • 2潘宝根.双代号搭接网络[A].中国网络计划技术大全[C].北京:地震出版社,1993.336-343.
  • 3郑传德,郑忠锎.带时限搭接时标网络在总进度计划中的应用[A].中国网络计划技术大全[C].北京:地震出版社,1993.366-369.
  • 4刘永淞,黄明娜.矩阵法计算搭接施工网络计划[J].基建优化,2001,22(4):28-29. 被引量:6

共引文献16

同被引文献19

引证文献7

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部